配电网电容器优化投切的改进模型及算法—《电网技术 》2008
- Translation or Not:no
Pre One: Configuration investigation on multi-floor disconnectable connections between primary and secondary structures in inter-block isolated mega-sub-control modular buildings for prompt activation of tuning
Next One:Investigation on multi-directional free-standing-object-structure interactions in mega-sub-control suspended buildings with tuning features

