· Xiaoming Wang,Zhantao Li, Qingxin Chen,Ning Mao. Meta-heuristics for Unrelated Parallel Machines Scheduling with Random Rework to Minimize Expected Total Weighted Tardiness [J], Computers & Industrial Engineering, 2020, 145. (SCI, IF=4.135, JCR一区)
· Xiaoming Wang, Qingxin Chen, Ning Mao, Xindu Chen, Zhantao Li. Proactive approach for RCMPSP based on Multi-priority rule combinations [J]. International Journal of Production Research, 2015;53(4):1098-1110. (SCI, IF=4.577, JCR一区)
· Zhantao Li, Jianjun Liu, Qingxin Chen, Ning Mao, Xiaoming Wang. Approximation algorithms for the three-stage flexible flow shop problem with mid group constraint [J]. Expert Systems with Applications, 2015; 42 (7): 3571-3584. (SCI, IF=5.452, JCR一区, top)
· Zhan-tao Li, Qing-xin Chen, Ning Mao, Xiaoming Wang, Jianjun Liu. Scheduling rules for two-stage flexible flow shop scheduling problem subject to tail group constraint [J]. International Journal of Production Economics, 2013; 146(2): 667-678. (SCI, IF=5.134, JCR一区, top)
· 王小明,朱松平,陈庆新,毛宁. 考虑随机返工与紧急插单的可抢占设计项目群调度[J], 计算机集成制造系统, 已录用待发表,2022. (EI)
· 王念家,王小明*,陈庆新,毛宁. 基于虚拟BOM的小批量定制产品通用件需求预测[J], 工业工程, 已录用待发表,2020. (北大中文核心)
· 朱松平,王小明*,鄢敏杰,陈庆新,毛宁. 考虑任务拆分特性与簇准备时间的并行机调度[J], 工业工程, 2022,25(01):114-122. (北大中文核心)
· 鄢敏杰,王小明*,朱松平,陈庆新,毛宁. 面向印制电路板钻孔任务动态调度的短视策略[J], 工业工程, 2021,24(06):18-24+56. (北大中文核心)
· 杜宏飞,王小明*,陈庆新,毛宁. 具有公有资源与私有资源约束的多项目调度规则对比研究[J], 工业工程, 2021,24(05):141-151. (北大中文核心)
· 王小明,陈庆新,毛宁. 基于近似动态规划的模具项目调度[J], 计算机集成制造系统, 2020;26(6):1691-1701. (EI)
· 王梦娜,王小明*,陈庆新,毛宁. 具有一般工期与返工的耦合设计任务评审策略分析[J], 计算机集成制造系统, 2020;26(5):1336-1344. (EI)
· 王小岗,王小明*,陈庆新,毛宁. 具有随机返工且可中断的设计任务调度[J], 工业工程, 2019, 22(5): 59-67. (北大中文核心)
· 来凯,王小明*,陈庆新,毛宁,陈新度. 面向模具项目动态调度问题的优先规则对比研究[J], 工业工程, 2017, 20(5): 28-37. (北大中文核心)
· 王小明,陈庆新,毛宁,陈新度. 资源与工期双重随机下的模具多项目监控[J]. 计算机集成制造系统. 2015;21(5): 1315-1326. (EI)
· 王小明,陈庆新,毛宁,刘建军,黎展滔. 考虑返修的模具剩余工期估计[J]. 机械工程学报.2014;50(7):199-208. (EI)
· 王小明,陈庆新,毛宁,刘建军. 随机环境下的模具项目交货期预测方法[J]. 计算机集成制造系统. 2012;18(2):405-414. (EI)
· Xiaoming Wang,Roel Leus,Stefan Creemers,Qingxin Chen,Ning Mao, A CTMDP-based Exact Method for RCPSP with Uncertain Activity Durations and Rework[C]// OR2017 Conference – the annual international conference of the German Operations Research Society (GOR), Berlin, Germany: September 2017.
· Xiaoming Wang, Xindu Chen, Qingxin Chen, Ning Mao, Zhantao Li. Statistical Analysis-based Method for Resource Decomposition in a Stochastic Multi-Project Environment[C]// 15th International Conference on Project Management and Scheduling, Valencia, Spain: April 2016.