|
Wu Jiekang,Guo Zhuangzhi,Wu Fan. Short-Term Multi-objective Optimization Scheduling for Cascaded Hydroelectric Plants with Dynamic Generation Flow Limit Based on EMA and DEA. International Journal of Electrical Power & Energy Systems,2014,57(2): 189-197 (SCI收录:AB4PP,EI收录:14573577,IF3.76)
点击次数:
是否译文:否
上一条:Wu Jiekang,Zhu Jianquan,Chen Guotong,Zhang Hongliang. A Hybrid Method for Optimal Scheduling of Short-term Electric Power Generation of Cascade Hydroelectric Plants Based on Particle Swarm Optimization and Chance Constrained Programming. IEEE Transactions on Power Systems,2008,23(4): 1570-1579(SCI收录:371WO,EI收录:20094512421788,,IF3.36)
下一条:Wu Jiekang,Wu Fan. Parameter Measurement of Low-Voltage Distribution Systems in Transient Processes-Algorithm and Simulation for RL Circuits. International Journal of Electrical Power & Energy Systems,2012,43: 351-357(SCI收录:371WO,EI收录:20123715437121,IF3.76)
